Thattamangalam-Nattukal‍ Road Chittoor‍ River bridge‍ will be under traffic control from ‍ from September‍ from seven‍ to November‍ to six‍ for maintenance‍.

Vehicles going via ‍ at Peruvemp Junction‍ via Palathulli Bridge and at Thattamangalam Ampat Palayam Junction‍ should take a right turn and proceed via Meenakshipuram - Valayodi-Vanditavalam. ‍ foot‍ pedestrians will be allowed on the bridge. Due to the temporary removal of pipes‍ for these works‍, due to temporary removal‍ of Chittoor‍ Thattamangalam municipality, the public works bridge department said that the drinking water supply will be interrupted for a few weeks‍Duls‍ for three alternate days‍ Asst.Engineer‍ informed. Phone‍: 7594975379.